Parallel Scheduling problem

I am trying to schedule a problem where the penalty is minimize. However, even though the penalty is minimized the schedule is not optimal because the duration can also  be minimize. Hoe do I code is in the Mosel Coding. Also if possible the sequence should depends on the weightage. How do I code in Mosel Coding as well. If anyone has any example that can helps

1 Reply

  • FICO's avatar
    FICO
    Community Manager

    Here are a few links to Mosel models for various types of scheduling problems:

    MIP models: https://examples.xpress.fico.com/example.pl?id=mosel_app_2

    CP models: https://examples.xpress.fico.com/example.pl#kalis_ug (descriptions in: http://www.fico.com/fico-xpress-optimization/docs/latest/solver/kalis/kalis_ug/dhtml/ )

    Combined MIP and CP solving: https://examples.xpress.fico.com/example.pl?id=sched_h (documented in: http://www.fico.com/fico-xpress-optimization/docs/latest/mosel/hybridmpcp/dhtml/ )