Hi,
Is it possible to sum a mpvar and an integer variable into an index of another mpvar ?
Example:
declarations
x: array(1..10,1..5) of mpvar
y: mpvar
end-declarations
y is_integer
y <= 2
forall(i in 1..10, j in 1..5 | exists(x(i,j+y)))do
x(i,j+y) <= 1
end-do
mosel raises the error E-151 Incompatible type for subscript num of `identifier'.
5 Replies
- FICOCommunity Manager
It is indeed not possible to use a decision variable as index value for another variable - however, it is probably possible to reformulate your constraints, for example using indicator constraints or logic constraints. Could you perhaps provide a textual description of what exactly is the relation that you wish to state?
- FICOCommunity Manager
Thank you.
I'll try to provide more detailed info.
For instance, consider 2 decision variables. Start(i,j) is 1 if task i starts at j and Finish(i,j) is 1 if task i finish the job at j.
If the time between start and finish is known, I can perform the following constraint:
declarations Start: array(1..nTask, 1..nTime) of mpvar Finish: array(1..nTask, 1..nTime) of mpvar time: array(1..nTask) of integer end-declarations forall(i in 1..nTask, j in 1..nTime)Start(i,j) = Finish(i,j+time(i))But now, if several options of time are available, for instance between 1 and 4, I want also to optimize the best choices of it.
- FICOCommunity Manager
I would suggest to work with additional variables representing the actual values per task that are selected via the 'Start' (-> 'ifstart') and 'Finish' (-> 'iffinish') variables - assuming that one of these is meant to be non-zero per task, being defined as binaries or SOS-1:
declarations ifstart: array(1..nTask, 1..nTime) of mpvar ! Start time selectors ('Start') iffinish: array(1..nTask, 1..nTime) of mpvar ! Completion time selectors ('Finish') tstart: array(1..nTask) of mpvar ! Start time value per (aggregation of 'ifstart' per task) tfinish: array(1..nTask) of mpvar ! Completion time (aggregation of 'iffinish' per task) wait: array(1..nTask) of mpvar ! Variable time in between start and finish end-declarations forall(i in 1..nTask) do ! ... define ifstart and iffinish as binary or as one SOS-1 per task ... sum(j in 1..nTime) ifstart(i,j) = 1 sum(j in 1..nTime) j*ifstart(i,j) = tstart(i) sum(j in 1..nTime) iffinish(i,j) = 1 sum(j in 1..nTime) j*iffinish(i,j) = tfinish(i) tstart(i) = tfinish(i)+wait(i) ! The actual relation to be stated end-doNote that I have changed the name of the array from 'time' to 'wait' in order to avoid any clashes with the type 'time' that is defined by the Mosel module 'mmsystem'.
- FICOCommunity Manager
Hello Susanne,
Sorry for my delayed answer and thanks for your help
How can I relate a binary variable x : array(1..nTask, 1..nTime) of mpvar to be 1 when j>= tstart(i) and j<= tfinish(i) ?
forall(i in nTask, j in nTime| j>= tstart(i) and j <= tfinish(i))x(i,j) == 1 forall(i in nTask)sum(j in 1..nTime)x(i,j) = wait(i)Thanks in advance!
- FICOCommunity Manager
Binary variables that indicate whether a task 'i' is in process at time 'j' could be connected up as follows using the 'ifstart' and 'iffinish' variables (NB: I am using 'duration' for the task processing duration which, I assume, is a more suitable name in place of the 'wait' from my previous code example). I am also correcting the relation linking start, duration, and finish times per task from my previous example:
declarations x: array(1..nTask, 1..nTime) of mpvar ! Processing indicators duration: array(1..nTask) of mpvar ! Task processing duration end-declarations forall(i in 1..nTask,j in 1..nTime) do x(i,j) is_binary sum(k in 1..j) ifstart(i,k) >= x(i,j) sum(k in 1..j) (ifstart(i,k)-iffinish(i,k)) <= x(i,j) end-do forall(i in 1..nTask) do sum(j in 1..nTime) x(i,j) = duration(i) tstart(i)+duration(i) = tfinish(i) end-do
Related Content
Related Content
I have an optimization model where setting certain variables can lead to constraint violations. Is there a way to identify and remove all infeasible constraints before solving the model?
1 year agoPlace FICO® Xpress Optimization ForumFICO® Xpress Optimization Forum2 unread comments2 unread0Views0likes2CommentsVariable names in callback (Java API)
I construct a cut in a preintsol callback using variables from the model containing the callback. When constructing the model, I give the variables names (using withName(...)) and store them in a vec...9 months agoPlace FICO® Xpress Optimization ForumFICO® Xpress Optimization Forum4 unread comments4 unread1View0likes4CommentsMPVAR mod integer
Hi all, I'm wondering is it possible to modulo an mpvar. I have a set of mpvars Xs which are binary and I want to have Sum(i in set) Xi mod 2 = 0 (in other words), the sum of the binary variabl...9 years agoPlace FICO® Xpress Optimization ForumFICO® Xpress Optimization Forum2 unread comments2 unread0Views0likes2Comments