Improving suboptimal solution for a network design problem
I'm solving a rather large network design problem (Xpress 9.2.4, python interface). Here's a very simplified version of the integer programming formulation.
Variables:
- y_ij: integer variable representing the number of vehicles required to service volume on arc (i,j)
- x_ijk: continuous variable representing the amount of volume for commodity k routed via arc (i,j)
Parameters:
c_ij: cost per vehicle on arc (i,j), with c_ij > 0 for every arc (i,j)
Q: capacity of a vehicle
Objective:
minimize sum_(i,j): c_ij y_ij
Constraint:
sum_k x_ijk <= Q y_ij for all (i,j)
... remaining constraints omitted.
I set a 2h time limit and solve the problem. After reaching the time limit, the solver terminates with a feasible solution.
Interestingly, when analyzing the solution, there's a few arcs where sum_k x_ijk = 0, yet the y_ij variable takes the value 1. Since the above constraint is the only constraint that relates to the y_ij variables, we can simply improve the objective value by setting y_ij=0 for those arcs.
I realize that because the solver terminated because of a time limit, the returned solution could potentially be suboptimal. I tried to run my instance much longer, but due to its size I cannot solve it to optimality (optimality gap < 3%). To verify that I did not make any implementation errors, I exported the model, fixed all variables to their values in the solution returned by Xpress. I only changed (set to 0) the y variables of arcs with sum_k x_ijk = 0. Then I resolved the model by Xpress which instantly returns this improved solution. This confirms that this better solution is indeed feasible and better.
I was somewhat surprised that I could find these simple opportunities to improve the objective. Is this as expected, or is there something I should be looking into?
1 Reply
- FICOCommunity Manager
Hey Joris,
Thanks for the detailed description; that helps a lot. You are right that the solver should usually detect such improvements; most of our heuristics have a step in place for this. I wonder why this did not apply here. Maybe, the solution was found by a heuristic that assumed it could be bypassed (but was apparently wrong), or your model uses some special structures that lead to skipping the step (even if said variables and constraints are not part of these structures, so there would be some room for improvement). I would suggest taking this to an e-mail conversation to see if we can get to the bottom of this question.
Timo
Related Content
Related Content
How to improve Bestbound?
e.g. my optimal solution for this dataset is 116. it reaches 116 within 1000 seconds but bestbound is still close to 0. Optimization part: multiplier=ub_nal * (QUARTERS[-1] - 1) + 1# spread of coef...6 months agoPlace FICO® Xpress Optimization ForumFICO® Xpress Optimization Forum4 unread comments4 unread0Views0likes4CommentsXpress solver claims suboptimal solution to be optimal
Hi, I'm working on a inventory assignment problem with future arrival assignment as well. Basically, there are: a constant onhand value, and constant known demand[S, L, T] for sku S at location L...2 years agoPlace FICO® Xpress Optimization ForumFICO® Xpress Optimization Forum2 unread comments2 unread0Views0likes2CommentsMIP solution status
Hello, I've been using code like this to get the solution status of a MIP: case getprobstat of XPRS_OPT: status:="Optimum found" XPRS_UNF: status:="Unfinished" XPRS_INF: status:="Infeasib...5 months agoPlace FICO® Xpress Optimization ForumFICO® Xpress Optimization Forum3 unread comments3 unread5Views0likes3Comments